改进题:According to the terms of the contract the shipment is to be effected by the 20th June and we must have the Bs/L by the 25th at the latest.
译文:按合同条款,6月20日前应交货,我们最多退迟到25日拿到提单。
【正确答案】:改进的译文:按合同条款,6月20日前应交货,我们最迟需在25日前拿到提单。
【题目解析】:p182
改进题:According to the terms of the contract the shipment is to be
- 2024-07-26 15:15:01
- 商务英语翻译(05355)