首页
The combined installation of DME and ILS is to replace _______ .
2023-12-26 22:26:07
英语
The combined installation of DME and ILS is to replace _______ .
A.VOR
B.DB
C.GS
D.MB
正确答案是D
上一篇:
760 mm (HG) at mean seal level is equivalent to _______ .
下一篇:
Above the rated altitude, the valid power of propeller _______ a